MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building

Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center., This news data comes from:http://www.xs888999.com
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
- A suicide bombing near a political rally in southwestern Pakistan kills 13 and wounds 30
- A tale of two cities: San Mateo rejects Manila's trash; Rizal opens landfill to Malabon
- Sara Discaya admits owning 28 luxury cars
- Most Filipinos distrust China, see it as biggest threat — OCTA survey
- DPWH engineer in bribery scandal placed under preventive suspension
- Repairs on Chinese ship in Bajo de Masinloc collision may take 2 months - PH Navy
- Trump plans a hefty tax on imported drugs, risking higher prices and shortages
- Trump withdraws Kamala Harris's Secret Service protection
- Metro Manila, rest of Luzon would be rainy due to ‘habagat’ —Pagasa
- An AI simulation of a Mount Fuji eruption is being used to prepare Tokyo for the worst